Power Trip Energy Corp Logo

 Power Trip Energy Corp
Craft Your Own Energy Destiny


Projects - 2010 - 2009 - 2008 - 2007 - 2006 - 2005 - 2004 - 2003

Dumenil Residence Port Townsend, WA
September 2004

3KW grid-tied and 40 ThermoMax tubes

Meyers Residence Sequim, WA
January 2004

This is the third grid-tied solar home on the Clallam PUD grid.

Pacific Ecological Institute
Quilcene, WA
February 2004

Kiosk with 1KW grid-tied

Stafford / Davis Residence
Port Townsend, WA
May 2004

2.2 KW on tracker - grid-tied with a battery bank

Wildberry Farm
Port Townsend, WA
October 2004

1KW grid-tied at home of Power Trip Energy Corp.

Zenovic / Pitts Residence
Port Angeles, WA
June 2004

4KW grid-tied

Mainland View Residence,
Suquamish, WA
October 2004

8.8KW grid-tied 150 ThermoMax tubes